Date:  7-25-2012
Number of Hours:  1.50
Manual Reference:  Page 7-11
Brief Description:  Flaps #4

After completing the left flap for deburring, priming and riveting, I moved onto the right flap and continued to the same process as the first flap.

I still have to countersink the spar on the left flap and drill out the nutplate for the rib and the FL706B

Getting close to finishing the wings to the point of the MDRA inspection. With my big vacation coming up and timelines with my family, the inspection will be by the end of the summer and the fuse kit ordered no later than October.
' style=

Rt flap 706B drilled in place

Rt flap 706B drilled in place

' style=

1/4 holes drilled for the nutplate

1/4 holes drilled for the nutplate

' style=

Rt flap 706A match drilled.

Rt flap 706A match drilled.